Showing posts with label Related California. Show all posts
Showing posts with label Related California. Show all posts
Wednesday, January 15, 2014
Watch Grand Avenue's Parcel M Tower Sprout in Two Minutes
With so much attention focused on the new Frank Gehry designs for Parcel Q, it's easy to forget that the Grand Avenue Project already has one residential building under construction. The 19-story Parcel M Tower broke ground in late 2012, and is now topped out just south of the Walt Disney Concert Hall. The Arquitectonica designed building carries a $120 million price tag, and is slated to open its 271 apartments late this year. In the meantime, check out the Parcel M Tower's live webcam, which has focused on the project site since shortly after groundbreaking. Perched atop the Colburn School, the camera provides a speedy time lapse video of the building's construction from ground level to its 215 foot apex above Grand Avenue. Making a guest appearance in the lower right hand corner is the Diller Scofidio + Refro designed Broad Museum. The $140 million project will share a pedestrian plaza with the residential tower when it opens, also in late 2014.
Tuesday, January 14, 2014
More Pictures of Wood Blocks: The New Grand Avenue Project
As reported yesterday by the Daily News, the LA County Board of Supervisors is scheduled to take a look at Frank Gehry's latest designs for the long awaited Grand Avenue Project. Related California's $750 million mixed-use development would create two high-rise buildings containing residential, hotel, office and retail space across from the iconic Walt Disney Concert Hall. A 37-story residential tower would rise from the corner of 2nd and Olive Streets, consisting of 450-apartments above a podium of retail and restaurant space. The 490-foot tall structure would feature a skydeck on its 28th floor, offering an outdoor pool with panoramic views of the city. The second tower, which abuts the 1st Street side of the property, would contain a 300-room SLS Hotel and just under 50,000 square feet of office space. The hotel/office building would rise 25 stories, with an architectural apex 345 feet above street level. The entire "Phase 1," would create just over 100,000 square feet of retail/restaurant space. Although the Grand Avenue Project is marketed as a transit oriented development, the towers would share a massive underground parking garage with room for 1,350 vehicles. Of course, if you want to leave your car behind, Parcel Q will eventually sit within easy walking distance of two subway stations serving Metro's Red, Purple, Blue and Gold Lines. Either way, it looks like we can expect a project that is both pleasing to the eye and inviting at ground level. Now how about we get some action on Parcel W?
Friday, September 27, 2013
Grand Avenue Project's $650 Million Phase 1 Revealed (UPDATED)
UPDATE: The Los Angeles Times has reported that the Grand Avenue Authority voted unanimously to reject Related California's updated plans for the Grand Avenue Project. Thus, the below information and images are already outdated. Looks like it's back to the drawing board for both the Authority and Related, which potentially means even further setbacks for the long delayed project. The Times indicates that Related will likely receive another three month extension to draw up new plans for the project. Should Related be removed as the project's developer, Los Angeles County will open itself to "major legal liability," as Related has already paid over $50 million towards the construction of Downtown's Grand Park.
Earlier this month, documents from the LA County Board of Supervisors revealed that Robert A. M. Stern Architects (RAMSA) had been commissioned to draw up new designs for the much anticipated Grand Avenue Project. Now, more information has emerged providing insight into Related California's revised plans for Phase 1 of the development. Although the new iteration of the Grand Avenue Project has been reduced in scope from Frank Gehry's pre-recession vision, it remains one of the largest real estate developments in Los Angeles. Phase 1 carries a staggering $650 million price tag.
Phase 1A is scheduled for groundbreaking in March 2015, with completion in September 2017. Cost estimate? A cool $160 million. It will consist of an approximately 48-story residential tower on the southern portion of the site, abutting the corner of Olive and 2nd Street. The 485 foot tall building will contain 380 apartments above 31,000 square feet of commercial space, served by a 400-car underground garage. The project will have studio, one and two bedroom units available for rent. While it is unclear if these renderings represent the final design for the Phase 1A tower, they are labeled with the name of the project's design architect, RAMSA.
Phase 1B is further down the pipeline, with groundbreaking scheduled for September 2017 and completion anticipated in June 2020. Based on the previously listed estimates from Related, Phase 1B will cost approximately $490 million. It will consist of a 250 key, 4 star hotel tower standing above 141,000 square feet of commercial space and a 20,700 square foot public plaza. This portion of the project would be served by a 940-car garage. The Phase 1B tower could contain 50 for-sale condominium units, if market conditions are hospitable to their inclusion. The commercial space includes room for a market, in addition to retail and restaurant space. Related told the Grand Avenue Authority earlier this year that Ralph's Fresh Fare had expressed interest in the location.
Although the document never explicitly states a height or number of floors for the Phase 1B tower, a diagram shows it standing approximately 41-stories and 453 feet above grade. However, the building could wind up significantly smaller should the condominium option not be included in the final plans.
With the details out of the way, how about some more eye candy? Keep in mind that much of this is merely conceptual.
Overall, Phase 1 of the Grand Avenue project will create up to 430 residential units, 250 hotel rooms, and 171,000 square feet of commercial space. Many feared a dramatic downsizing of the project after Frank Gehry's plans were officially discarded earlier this year. It is a relief to see that Related is still pushing forward with an ambitious vision for the site at an appropriately cautious pace.
![]() |
| The Gensler designed Master Plan for Parcel Q, a.k.a. Phase 1 |
Earlier this month, documents from the LA County Board of Supervisors revealed that Robert A. M. Stern Architects (RAMSA) had been commissioned to draw up new designs for the much anticipated Grand Avenue Project. Now, more information has emerged providing insight into Related California's revised plans for Phase 1 of the development. Although the new iteration of the Grand Avenue Project has been reduced in scope from Frank Gehry's pre-recession vision, it remains one of the largest real estate developments in Los Angeles. Phase 1 carries a staggering $650 million price tag.
Phase 1A is scheduled for groundbreaking in March 2015, with completion in September 2017. Cost estimate? A cool $160 million. It will consist of an approximately 48-story residential tower on the southern portion of the site, abutting the corner of Olive and 2nd Street. The 485 foot tall building will contain 380 apartments above 31,000 square feet of commercial space, served by a 400-car underground garage. The project will have studio, one and two bedroom units available for rent. While it is unclear if these renderings represent the final design for the Phase 1A tower, they are labeled with the name of the project's design architect, RAMSA.
![]() |
| View of the Phase 1A tower from the southwest. |
Phase 1B is further down the pipeline, with groundbreaking scheduled for September 2017 and completion anticipated in June 2020. Based on the previously listed estimates from Related, Phase 1B will cost approximately $490 million. It will consist of a 250 key, 4 star hotel tower standing above 141,000 square feet of commercial space and a 20,700 square foot public plaza. This portion of the project would be served by a 940-car garage. The Phase 1B tower could contain 50 for-sale condominium units, if market conditions are hospitable to their inclusion. The commercial space includes room for a market, in addition to retail and restaurant space. Related told the Grand Avenue Authority earlier this year that Ralph's Fresh Fare had expressed interest in the location.
Although the document never explicitly states a height or number of floors for the Phase 1B tower, a diagram shows it standing approximately 41-stories and 453 feet above grade. However, the building could wind up significantly smaller should the condominium option not be included in the final plans.
With the details out of the way, how about some more eye candy? Keep in mind that much of this is merely conceptual.
| Aerial view of the project site from the south. I hope that the blank wall at the Olive/2nd Street corner doesn't make it into the final design. |
Overall, Phase 1 of the Grand Avenue project will create up to 430 residential units, 250 hotel rooms, and 171,000 square feet of commercial space. Many feared a dramatic downsizing of the project after Frank Gehry's plans were officially discarded earlier this year. It is a relief to see that Related is still pushing forward with an ambitious vision for the site at an appropriately cautious pace.
- Grand Avenue Project - Phase 1 (Grand Avenue Authority)
- Robert A. M. Stern to Design Phase 1A of the Grand Avenue Project (Building Los Angeles)
Wednesday, September 18, 2013
Robert A. M. Stern to Design Phase 1A of the Grand Avenue Project
| The Grand Avenue Project's Phase 1 site, otherwise known as Parcel Q |
After months of speculation, the LA Downtown News reported in January that Frank Gehry's $2 billion design for the Grand Avenue Project would not be moving forward. Now, another architectural giant will try his luck with the long stalled development. According to a document from the LA County Board of Supervisors, Robert A. M. Stern Architects (RAMSA) will be the new design architect for Phase 1A of the Grand Avenue Project. Developer Related California also indicated to the Grand Avenue Authority that while there is no master plan for the development, they have been collaborating with San Francisco based Gensler to "look for a template that [works] for the entire site."
Under Related's revised plans for the Grand Avenue Project, Phase 1A calls for a 380 unit residential tower with ground level commercial space at the northeastern corner of 2nd Street and Grand Avenue. While no specifics have been released regarding the Phase 1A tower's height, Related California President Bill Witte told the Downtown News that it could be taller than the 19-story Parcel M tower which broke ground earlier this year. Witte also indicated that Related was considering a "hybrid building," featuring for-sale condominiums on the upper floors and rental units on the lower levels. Groundbreaking for Phase 1A is tentatively scheduled for March 2015.
Phase 1B will consist of a 250 key hotel tower with commercial space on the 1st Street side of the parcel. The hotel tower could also have 50 for-sale condominiums, should market conditions justify their inclusion. However, neither an architect nor a timeline have been specified for this part of the development.
Phase 1B will consist of a 250 key hotel tower with commercial space on the 1st Street side of the parcel. The hotel tower could also have 50 for-sale condominiums, should market conditions justify their inclusion. However, neither an architect nor a timeline have been specified for this part of the development.
While Robert A. M. Stern has had a career that most architects could only dream of, RAMSA has designed few large scale projects in the Los Angeles area. They previously collaborated with Related California on the 42-story condominium tower in West Los Angeles known as "The Century." RAMSA is also responsible for the design of the proposed 29-story Gayley at Wilshire.
![]() |
| Two Robert A. M. Stern designs: The Century (L) and the Gayley at Wilshire (R) |
Although Stern has a reputation for "throwback," designs, his firm has a knack for creating buildings that fit in well with their surroundings. It will be interesting to see how their design complements the metallic, postmodern Walt Disney Concert Hall and the honeycombed Broad Museum on the opposite side of Grand Avenue.
- Statement of Proceedings: July 22 2013 (Grand Avenue Authority)
- Statement of Proceedings: April 29, 2013 (Grand Avenue Authority)
- Developer Unveils New Plan for Grand Avenue (LA Downtown News)
- The Grand Avenue Project's First Building Broke Ground Today (Curbed LA)
Friday, September 13, 2013
Watch Metro Build the Expo Line's Downtown Santa Monica Station
A few weeks ago, Transit Coalition Forumer Gokhan linked to a Santa Monica website featuring a live construction camera for the Expo Line's future Downtown Santa Monica Station. This location will soon become an epicenter for pedestrian activity in Santa Monica, with the Expo Line expected to carry 64,000 passengers per day by 2030. Downtown Santa Monica Station will be in close proximity to the Santa Monica Pier, Third Street Promenade and Santa Monica Place. A slew of proposals for new mixed-use developments have also emerged within walking distance of the station.
![]() |
| Artist's rendering of the Downtown Santa Monica terminus of the Expo Line; Image from BuildExpo. |
- Transit Coalition Forum
- Expo Light Rail (City of Santa Monica)
Subscribe to:
Posts (Atom)








